Work is going ahead on completing the HWC Resource Centre building. Here are some photos sent through from Buka showing progress today, and an earlier photo showing the front of the building.
Funds are still urgently needed for this work, as noted in an earlier post. The campaign on GoFundMe is going well, with $1200 raised so far, but there is some way to go to reach the target of $5000. To donate, or spread the news, click
here.
|
Making built-in furniture for the Resource Centre, 1/3/2016 |
|
Laying concrete in the reading area, 1/3/2016 |
|
Preparing to lay concrete, 1/3/2016 |
|
Reading area at front of the Resource Centre, 17/2/2016 |